Mobile and crawler-crane operations for module placement, vessel installation, and equipment lifts. Every lift starts with an engineered study — ground bearing, rigging design, and load path documented before mobilisation.
Engineered lifts mean the math is done before the crane arrives. We run lift studies, plan rigging, and execute under documented permits.
Crane selection · ground-bearing pressure analysis · rigging design · load-path simulation · exclusion-zone mapping. Signed off before mobilisation.
Slings, shackles, spreader beams, lift lugs — sized to the load with appropriate safety factors. All gear with valid certificates and inspection logs.
Toolbox talks · lift permits · spotter and signaller positions · exclusion zones · lift in progress. Demobilisation with as-left site documentation.
Crane capacity is matched to the lift study, not pre-fixed. We mobilise the equipment the engineering says is right — owned or sourced from vetted partners.
No documented lift, no pick. That’s the rule. Every lift goes through the same paperwork — heavy or light, routine or critical.
Lift plan with crane configuration, load chart, ground-bearing capacity, rigging schematic, and exclusion zone. Permit-to-lift signed by the lift supervisor.
Crane inspection certs, operator licenses (SIO), rigger certifications, and gear inspection records — all current and on site.
Pre-lift toolbox talk, spotter and signaller assignments, weather check, exclusion zone walk-down, and post-lift debrief. Recorded each day.